Production cannot be added at the moment. Please try again
Warning
Production name is already added. Please select other production name
Warning
Production name is required
Warning
Customer name is required
Warning
Part description is required
Warning
Order number is required
Warning
Sprue weight is required
Warning
Barrel purge weight is required
Warning
Batch number is required
Warning
Please select a product
Warning
Please select a machine
Warning
Please select color/colors
Warning
Please select material/materials
Warning
Actual cycle time is required
Warning
Actual shot weight is required
Warning
Production quantity per colour is required
Warning
Material percentage is required
Warning
Overall material percentage should sum to 100%
Warning
Start up check list is incomplete
Warning
Material cannot be edited at the moment. Please try again
Success
Material is edited successfully
Warning
Material name is already used. Please use other material.
Select Colors
Mould Installation & Startup Checklist
Sr
Startup Tasks
Checked
1
Injection unit is retracted
2
Mould platens are sufficiently open for
3
Mould locating ring is center to the machine locating ring
4
All clamps are parallel.
5
All bolt threads are 1.5 times the diameter of the bolt
6
All bolts are torqued to 120nm
7
Ejector bar is attached and ejector coupler is locked
8
Lifting strap has been removed and placed on the wall mounted black box
9
Water pipes are connected, turned on and working correctly
10
Air pipes are connected, turned on and working correctly. Note: When connecting air to an air poppet valve first spray some lubricant into the pipe to lubricate the poppet valve
11
Hydraulic pipes are connected and working correctlly
12
Mould position, ejector system & injection unit are zeroed (if applicable) and working correctly
13
Mould clamping force has been set (if applicable)
14
Mould face is clean
15
Pins & bushes are lubricated
16
Mould program has been loaded
17
Set the machine counter to zero & enter the correct schedule
18
Correct material & masterbatch is at the machine and loaded into the hopper
19
Check that the masterbatch doser is on (if applicable)
20
Check barrel is at the correct temperature and barrel soaking is complete
21
Check hot-runner (if applicable) is at the correct temperature
22
Check the recovery position is correct
23
Start machine cycle on single cycle only
24
Check parts confirm to the product specifications.